SEEMP Part III — CII Management

Build measurable responsibilities and actions, rather than watching the annual rating alone.

Part III is the operational carbon-intensity plan for relevant ship types ≥5,000 GT; distinguish Part I/II scope.

Your action sequence at a glance

  1. Scope/plan

  2. Data/annual target

  3. Action/ownership

  4. Review/correction

MASTER • RESPONSIBLE OFFICER • COMPANY

Start with these 6 checks

  1. Check Part III applicability and verified revision.
  2. Match required/attained CII and input data.
  3. Review three-year targets, owners and action schedule.
  4. Monitor monthly deviations and operational/technical causes.
  5. Assess D/E triggers and corrective-plan requirements.
  6. Complete office, Administration/RO and annual evidence chain.

Educational checklist. Completion is not operational/compliance approval; use the relevant vessel permits/forms separately.

Documents to have available

Select a document card for guidance. Obtain vessel-specific documents from authorised company/ship systems. A reference link is not a document download.

Verified SEEMP Part III

Retrieve the verified vessel SEEMP Part III and applicable revision from controlled files.

Open topic references and guidance →
IMO DCS/CII data and Statement of Compliance

Match IMO DCS/CII data and the Statement of Compliance for the relevant year.

Open topic references and guidance →
Three-year implementation plan

Retrieve the vessel three-year implementation plan, responsibilities and monitoring records from company/ship systems.

Open topic references and guidance →
Self-evaluation and any corrective-action plan

Prepare self-evaluation records and any corrective-action plan with the relevant period and version.

Open topic references and guidance →
Open rules and technical detail

1 · Separate the three parts

Part I manages energy efficiency; Part II addresses fuel-consumption data collection; Part III is the operational carbon-intensity plan. Check MEPC.395(82) and later amendments rather than relying only on an old 2022 template.

Reference: IMO — MEPC.395(82), 2024 SEEMP guidelines ↗

2 · Monitor the ship-specific calculation

Track required/attained CII, applicable capacity, consumption, distance and accepted corrections using the ship method. A–E ratings are not one universal fuel-tonnage target. Do not weaken navigational safety to improve a rating.

Reference: IMO — EEXI and CII FAQ ↗

3 · Three-year implementation and ownership

The plan should identify methods to achieve the next three years’ targets, responsibilities, monitoring/self-evaluation and implementation timetable. Assess speed/route optimisation, waiting, hull/propeller condition and consumers with safety and technical suitability.

Reference: IMO — MEPC.395(82), 2024 SEEMP guidelines ↗

4 · D/E corrective action

Three consecutive D years or one E year triggers corrective-action planning and SEEMP review/verification. Follow ship/office responsibilities and Administration/RO timing. Obtain future-year factors from current sources as the IMO review progresses.

Reference: IMO — EEXI and CII FAQ ↗
Scenarios and self-check

Onboard scenarios

One D year: has the three-D trigger occurred?

No. Check consecutive history and E separately; still monitor deviations.

One E year: can action wait?

One E year triggers corrective-action planning; follow office/Administration procedures.

LEARNING CHECK

Think of your answer, then reveal the explanation

Are Parts II and III identical?

No; data collection and operational carbon planning are different parts.

May navigational safety be sacrificed for CII?

No. Measures must be planned with safety and technical suitability.

Self-assessment only; no exam result, personnel record or competence certificate is generated.

Open official sources

Open the official sources

Legal instruments, explanatory guidance and operational bulletins have different roles. Check later amendments and consolidated texts where needed. Access and external documents remain under the publisher’s control.

Learning diagram and scope notes
SEEMP Part III — CII Management — schematic learning diagram
Original educational schematic, not to scale. Not an operating diagram, official area chart or ship drawing. Numbers correspond to the stages below.
CAR-04Source review: 17 October 2026Revision 1 · Source-based reference

Rules and bulletins may change. Before operation or voyage, verify the latest official source and ship-specific applicability. This page is not permission, certification or a real-time risk notice.