Maritime Academy

Load Lines — Summer, Winter and Seasonal Zones

Plan by certificate and the zones/dates throughout the voyage, not weather at the loading port.

NAV-03Source review: 17 October 2026Revision 1 · Source-based reference

Assess assigned marks, density, stability and structural limits together. The diagram is not a loading calculation.

Rules and bulletins may change. Before operation or voyage, verify the latest official source and ship-specific applicability. This page is not permission, certification or a real-time risk notice.

Read the mark; verify the zone separately

Use the upper edge of the applicable mark. S: Summer; W: Winter; T: Tropical; F: Summer Fresh Water; TF: Tropical Fresh Water. A lower mark means greater freeboard and less permitted draught. F/TF are not seasonal zones.

WNA: regulation 40(6) adds 50 mm to Winter freeboard for ships not exceeding 100 m within regulation 52 areas during winter. For other ships WNA freeboard equals Winter. Do not automatically substitute LOA for the regulatory length; check the certificate and definition.

Reg.6 / 40 — Marking and WNA reference ↗

Official zone chart and key seasonal distinctions

IMO — Chart of Zones and Seasonal Areas ↗

2023 corrigendum; PDF page 4 for the 1988 Protocol text. Includes southern winter-zone coordinate corrections.

ZoneWinterSummer
North Atlantic Zone I16 Oct – 15 Apr16 Apr – 15 Oct
North Atlantic Zone II1 Nov – 31 Mar1 Apr – 31 Oct
North Atlantic Seasonal Area · L > 100 m16 Dec – 15 Feb16 Feb – 15 Dec
North Atlantic Seasonal Area · L ≤ 100 m1 Nov – 31 Mar1 Apr – 31 Oct
North Pacific Winter Seasonal Zone16 Oct – 15 Apr16 Apr – 15 Oct
Southern Winter Seasonal Zone16 Apr – 15 Oct16 Oct – 15 Apr

Selected periods, not a worldwide table. Zone I, Zone II and Seasonal Area are distinct. The chart omits ≤100 m exceptions for the Baltic, Black Sea, Gulf of Lion, Sea of Japan and the US coastal corridor; read Annex II as well.

Boundary-crossing planning record

  1. Record certificate assignment and applicable zone/date.
  2. Use approved tools to project consumption, ballast, cargo and density changes to the crossing.
  3. Compare crossing draught with the assigned limit; separately complete trim, stability, strength and UKC checks.

FOUR-STAGE TOPIC OVERVIEW

Establish applicability, then verify the operation

Load Lines — Summer, Winter and Seasonal Zones — schematic learning diagram
Original educational schematic, not to scale. Not an operating diagram, official area chart or ship drawing. Numbers correspond to the stages below.
  1. Assigned certificate

  2. Zone/crossing date

  3. Voyage draught/density

  4. Stability/final review

1 · Read the assigned certificate

Compare International Load Line Certificate, marks and conditions. Summer (S), Winter (W), Tropical (T), Fresh Water/TF and applicable WNA/timber assignments are not interchangeable. Do not invent unassigned marks or allowances.

Reference: IMO — International Convention on Load Lines ↗

2 · Position and seasonal dates

Convention Annex II defines zones, seasonal areas and periods. Local summer does not itself authorise the Summer mark. Check each route crossing/date, regional periods and applicable WNA conditions against official text/corrected charts.

Reference: IMO — Load Lines 2021 edition: December 2023 chart corrigendum ↗

3 · Maintain compliance throughout the voyage

Project loading, departure and entry draught into more restrictive areas. Assess actual water density, assigned freshwater allowance, trim/list, fuel/water consumption and approved calculation method. Separately check whether a summer departure becomes excessive at winter-zone entry.

Reference: UK MCA — Stability guidance and load lines ↗

4 · Marks are not the only limit

Load-line compliance does not remove stability, longitudinal strength, local load, port/canal draught, UKC or conditions-of-assignment requirements. Preserve hatch/opening integrity. Final planning rests on the master’s assessment and approved ship loading/stability tools.

Reference: IMO — International Convention on Load Lines ↗

MASTER • RESPONSIBLE OFFICER • COMPANY

Six field checks

  1. Verify certificate, marks and conditions.
  2. List every seasonal-zone crossing and date.
  3. Confirm applicable S/W/T/F/TF/WNA conditions from documents.
  4. Calculate departure/crossing draught, density and trim.
  5. Check stability, strength, port draught and UKC separately.
  6. Preserve plan, calculations, consumption assumptions and master confirmation.

Educational checklist. Completion is not operational/compliance approval; use the relevant vessel permits/forms separately.

Documents to have available

  • International Load Line Certificate
  • Current Annex II and corrected zone/season chart
  • Approved stability/loading-computer output
  • Draught, density, consumption and cargo-plan records

Onboard scenarios

Summer-compliant departure; Winter applies mid-voyage.

Calculate draught at the boundary/date against the assigned Winter limit.

Calm weather: may Summer replace Winter?

No. Weather appearance does not change zone/season/certificate requirements.

LEARNING CHECK

Think of your answer, then reveal the explanation

Is freshwater allowance identical for every ship?

No. Use the assigned value and actual density in ship-specific calculations.

Does load-line compliance establish UKC compliance?

No. Port/channel depth, squat and UKC need separate assessment.

Self-assessment only; no exam result, personnel record or competence certificate is generated.

Open the official sources

Legal instruments, explanatory guidance and operational bulletins have different roles. Check later amendments and consolidated texts where needed. Access and external documents remain under the publisher’s control.

Related topics