Maritime Academy

Ferromanganese — Preparation, Voyage Checks & Cleaning

Ferromanganese, ferrosilicon and ferrophosphorus differ.

Scope, source date and conditions of use

See profile review date in Sources. General preparation and cleaning reference. Selecting a cargo does not authorise carriage, hold acceptance, enclosed-space entry or discharge. Use the exact declaration, vessel SMS, current schedule, manufacturer instructions and company-approved work plan.

General hold photograph, not an operation involving this cargo.

MASTER’S CARGO FILE

Ferromanganese

Ferromanganese, ferrosilicon and ferrophosphorus differ.

VileGecko · General hold photograph · CC BY-SA 4.0 · Converted to WebP; not evidence of carriage of this cargo.

Use the exact declaration, current applicable schedule and vessel approved plan. This file is not loading or enclosed-space-entry authorisation.

01 · Hold preparation before loading
02 · Cargo monitoring during the voyage
  1. Record bilge/movement and other required checks under its own schedule.
  2. Record measurements/observations with time, hold and method.
  3. Report abnormalities to the master; do not enter a loaded hold to inspect.

Obtain measurement intervals, alarm thresholds and ventilation regime from the exact cargo schedule and approved plan. Do not enter a loaded hold to inspect.

Open voyage check note / include in PDF

Fields are not sent to the server and are lost on leaving the page. Use Print / PDF to retain them. This is not an alarm or automatic monitoring system.

References for this stage IMO — IMSBC 07-23; effective 2025, check later applicable amendments ↗

Voyage prompts: 18 October 2026. Older publications provide technical background; they do not replace the current consolidated schedule.

03 · Hold cleaning after discharge
Change previous / following cargo

Add the cargo sequence to this file

TO LOAD NOWFerromanganese
What does this selection show?

This selection is not a chemical-compatibility matrix or a loading clearance; it brings the selected cargo checks together.

Previous / following cargo and detailed work file

CARGO TRANSITION WORK FILE

Previous cargo unknown → Ferromanganese

Existing checks from the selected profiles are assembled here; this is not a validated transition-specific chemical recipe or carriage-compatibility decision. Entered information is not submitted or stored on the server and is lost on leaving the page.

Previous cargo is unknown. Establish cargo history and remaining product before choosing a cleaning method.

PREVIOUS RESIDUENEW CARGO REQUIREMENTSDOCUMENT AND FIELD CHECKS
Cargo to load now: verify preparation · Ferromanganese

Ferromanganese, ferrosilicon and ferrophosphorus differ.

  1. Confirm exact product/size; check heavy-load distribution and tank-top limits.
  2. Verify previous cargo, written cleanliness standard, hatches/bilges and safe access.
  3. Match the declaration to vessel documents and the approved loading plan.

Profile sources: IMO — IMSBC 07-23; effective 2025, check later applicable amendments ↗ IMO · IMSBC / Grain Code distinction ↗ UK P&I · Hold preparation and cleaning, chapter 17 (2023) ↗ IMO · MSC.581(110), 2025 enclosed-space recommendations ↗ IMO — IMSBC 08-25; voluntary 2026 / entry into force 2027 ↗ UK MCA — MIN 730; 08-25 voluntary in 2026, mandatory in 2027 ↗ UK P&I — Hold preparation and cleaning FAQ ↗ IMO · MARPOL Annex V / cargo residues ↗

After this cargo is discharged: plan cleaning · Ferromanganese

Ferromanganese, ferrosilicon and ferrophosphorus differ.

  1. Safely remove heavy pieces; clean dust/bilge pockets and record damage.
  2. Record residue, odour, dryness and coating damage against the next cargo standard.
  3. If chemicals are needed, verify SDS/PDS and coating compatibility; apply the residue/wash-water plan.

Profile sources: IMO — IMSBC 07-23; effective 2025, check later applicable amendments ↗ IMO · IMSBC / Grain Code distinction ↗ UK P&I · Hold preparation and cleaning, chapter 17 (2023) ↗ IMO · MSC.581(110), 2025 enclosed-space recommendations ↗ IMO — IMSBC 08-25; voluntary 2026 / entry into force 2027 ↗ UK MCA — MIN 730; 08-25 voluntary in 2026, mandatory in 2027 ↗ UK P&I — Hold preparation and cleaning FAQ ↗ IMO · MARPOL Annex V / cargo residues ↗

Open actions and responsibility

Statuses are a record, not a safety score, cleanliness acceptance or loading authorisation. Record a reason for not-applicable items.

Open record fields · 6 check headings
1 · Exact commercial identity, cargo declarations and cargo history
2 · Written cleanliness and acceptance requirements for the next cargo
3 · Entry, atmosphere checks, isolation and safe-access plan
4 · Coating compatibility; if used, exact chemical, current SDS/PDS and maker conditions
5 · Water, equipment, time and residue/wash-water management
6 · Final inspection, required tests and acceptance/authorisation responsibility

Refer unresolved or unapproved items to the responsible company personnel. This file does not replace SMS permits and acceptance processes.

Profile source review: 2026-10-18 · File generated: 2026-10-19 13:21 +03

Hold map and work sequence

VISUAL FIELD GUIDE

Where to look inside the hold

Open a numbered heading to inspect the highlighted area and its check note together. The drawing does not authorise access or entry.

Numbers correspond to the adjacent check headings. Not an actual vessel plan. 1 2 3 4 5 6 7 8
Original cutaway, not to scale. Numbers identify inspection areas, not hull construction, work platforms or rescue arrangements. Inspect upper areas only through approved safe access/observation methods.
1Hatch underside & coaming

Check deposits that may fall back from hatch undersides and channels. Keep drainage clear.

Record: Hatch underside / channel photograph
2Underdeck brackets

Do not infer clean upper recesses and blind faces from a clean tank top.

Record: Upper-surface observation record
3Frames & hopper faces

Check front and back faces separately; record loose deposits, scale and flaking paint.

Record: Blind-face inspection
4Ladders & supports

Check behind rungs and supports for residue; do not use damaged access fittings.

Record: Access defect / work order
5Tank top & manhole edges

Check plate edges and cover recesses for solids, water and impact damage.

Record: Closing tank-top photograph
6Bilge well & strainer

Inspect wells and protection; do not leave fine sludge within fixed piping.

Record: Well / strainer check
7Pipes, guards & vents

Include surfaces behind pipes and guard recesses in inspection coverage.

Record: Behind-pipe / guard record
8Surface test area

Assess an approved small representative patch; do not automatically extrapolate to the whole hold.

Record: Before/after and coating findings

UK P&I · Chapter 17 ↗ · West P&I · Inspection & cleaning ↗

SIX-STAGE WORK PLAN

Sequence, evidence and stop points

These stages support preparation of the approved work plan. Dry recovery, prewashing, chemical application and rinsing sequences differ between products.

Define the task01

Define the task

Record: Cargo declaration + written acceptance criteria

Stop / reassess: Do not select a method with unknown residue or standard.

How should I assess this?

Write down previous residue, intended cargo and required standard. Plan water, equipment, time and waste arrangements accordingly.

Reference document ↗
Establish safe work arrangements02

Establish safe work arrangements

Record: Permit / measurements / equipment records

Stop / reassess: Do not enter if atmosphere, access or rescue conditions are unmet.

How should I assess this?

Under the SMS, verify risk assessment, permit, isolation, atmosphere testing, communications and rescue.

Reference document ↗
Separate and recover residue03

Separate and recover residue

Record: Residue type + collection / disposal route

Stop / reassess: Do not start generic water/chemical cleaning on unknown or reactive residue.

How should I assess this?

Distinguish loose solids, oily film, adherent deposits and reactive material. Establish a suitable collection method.

Reference document ↗
Verify product and method04

Verify product and method

Record: Product / batch + dilution + contact time

Stop / reassess: Stop for coating softening, colour transfer or an unexpected reaction.

How should I assess this?

Match exact-product SDS/PDS with coating and following-cargo requirements. Record an approved patch trial and result.

Reference document ↗
Verify rinsing and dryness05

Verify rinsing and dryness

Record: Water source + rinse / drying observations

Stop / reassess: Do not close the stage under time pressure if product/cargo conditions are unmet.

How should I assess this?

Wash/rinse only when permitted by the approved method. Check water used, remaining detergent/salt and dryness against the following cargo.

Reference document ↗
Separate final inspection from acceptance06

Separate final inspection from acceptance

Record: Before/after photographs + open items + acceptance record

Stop / reassess: Plan correction and reinspection if residue, odour, moisture or defects remain.

How should I assess this?

Reinspect the eight areas; retain photographs, open defects and required survey findings. Work completion is not cargo acceptance.

Reference document ↗
Photographic field lessons

MOVE FROM READING TO INSPECTION

Explore inspection points in actual photographs

General educational photographs, not this cargo’s operation or an acceptance example. First photograph: VileGecko; second: ImagePerson, an industrial surface rather than a ship. CC BY-SA 4.0 · Photo sources and explanations

Residue and wash-water detail

Residue and wash-water plan

Determine the cargo’s HME status and assess cleaning agents, discharge location and applicable MARPOL Annex V/local requirements. A supplier’s non-HME statement for a cleaner does not itself authorise discharge of the complete wash-water mixture. Arrange reception facilities when required and retain the applicable records.

Open the full general hold guide →
Chemical and SDS documents

DOCUMENTS FOR THE CARGO SEQUENCE

Which product document for which residue?

No ready-made chemical application package is supplied for this sequence. Exact residue, cargo, coating and reactivity information requires a company/manufacturer/specialist method.

General chemical document library →
Final checklist and records

Pre-work verification and record list

Ticks are cleared when you leave this page. Print/save the completed checklist to your own record system. Ticking items does not grant permission or acceptance.

Download the general hold checklist (PDF) ↓
All profile sources

Sources for this profile

Check publication dates and later changes. Club guidance, manufacturer documents and binding schedules have different roles. This file is not a complete carriage manual.

Source review: 2026-10-18

Report a document link problem (email) →

Dadaylılar Shipping

Let’s discuss your cargo.

Contact our team with the exact cargo description, quantity, ports and planned dates. Enquiries are assessed against the relevant vessel’s documents and operational suitability.