GHG Rating · A–E
Compares design efficiency with peer vessels; the peer group changes. We do not recalculate the official rating here.
GHG Rating methodology ↗Maritime Academy
Official RISQ, vetting, Safety Score, GHG/CII and close-out references with an independent readiness work file.
RIGHTSHIP · READINESS & OFFICIAL SOURCES
Track inspection, vetting, environmental data and finding closure separately. This centre supports preparation; it does not issue RightShip approval or outcomes.
Official issue: November 2025. Verify applicable sections in the official document. The links open PDF pages; the complete questionnaire is not reproduced here.
RISQ 3.2 · November 2025 ↗Some PDF readers may ignore the page fragment; use the section number.
Current Dry Bulk Baseline: Revision 4.0, effective 1 October 2026. Select the separate official document for other vessel groups.
Safety Score alone is not a vetting acceptance. The particular cargo/voyage and customer criteria are assessed as well.
Safety Score & Vessel Vetting ↗| Implementation | Published threshold |
|---|---|
| 01.04.2026 | 12 years and above |
| 01.07.2026 | 11 years and above |
| 20.01.2027 | 10,5 years and above |
Age uses the delivery date; build year alone is insufficient. This schedule concerns dry bulk/general cargo. Performance can also trigger inspection independently of age.
Inspection age trigger · updated 26 May 2026 ↗Schedule source check: 17 October 2026. A future threshold is not treated as current. Confirm boundary dates and platform records with RightShip; this page has no age/approval calculator.
The work file exposes missing evidence, date discrepancies and unexplained findings. It does not replace RightShip review or the customer’s vetting request.
Compares design efficiency with peer vessels; the peer group changes. We do not recalculate the official rating here.
GHG Rating methodology ↗CII addresses past operational performance; GHG addresses design potential. The same letter scale does not mean the same assessment.
GHG, EEXI & CII distinctions ↗Keep separate references for the current platform record, EEDI/EEXI technical files, CII document and changes. Submit evidence through the official channel.
Environmental Review ↗Inspection date alone does not establish validity; use the final report and platform record. Automatic show-stopper impacts were removed from 17 June 2026; earlier closed outcomes are not changed retrospectively.
Inspection Validity Criteria ↗Finding → cause analysis → correction → prevention → verification evidence. A closure submission does not establish acceptance.
Close-out guidance · November 2025 ↗These independent work notes are not official RISQ questions. Entries are not stored or submitted; print/save PDF before leaving.
Independent preparation centre, not a RightShip-approved or affiliated service. Links open official sources. Recheck issue and scope before use.